New construction of a 18 part cell cooling tower Hürth – Knapsack

Performed services – building time of 7 months

  • buidling of cooling packages with the welding method
  • building of the drip catching layer by interconnection
  • ground level pre-assembly of the single supporting elements of wood
  • positioning of the supporting elements with a mobile crane
  • completion of the wood construction
  • installation of the cooling packages, the water distribution and the drip catching layer
  • mounting of the acoustic backdrops
  • mounting of the fans and polygones incl. alignment
  • mounting of the facades and staircase towers
  • mounting of the railings